Solar with Florida Keys Electric Cooperative (FKEC)

Florida Keys Electric Cooperative (FKEC) members pay 15.1¢ per kWh and no demand charge; a typical home's solar pays back in about 10 years.

Not yet verified. Florida Keys Electric Cooperative (FKEC) does not publish a rate schedule online. The figures here are estimates pending the schedule; call the utility or upload a bill for your real price.

See the numbers for your address

At a glance

Energy rate
15.1¢/kWh
tiered by monthly use, riders included
Fixed charge
$30/mo
billed every month, solar or not
Demand charge
None
every offset kWh saves the full rate
Net-metering limit
1000 kW AC
bank resets in January

Residential schedule effective April 1, 2026; checked November 1, 2026. Sources.

What this means for solar

  • Excess power is banked as kWh at the full retail rate and drawn down in later months. The bank resets in January, and anything left is forfeited to the utility.
  • Florida Keys Electric Cooperative (FKEC) has no residential demand charge, so every kWh solar offsets saves the full energy rate.
  • Systems up to 1000 kW AC qualify for net metering; above that, capacity would run without export credit.

A typical home: 1100 kWh a month, electric heat

Net-zero system
8.3 kW
1584 kWh per kW per year
Installed cost
as low as$18,346
up to $22,423
First-year savings
up to$1,930
at least $1,684
Payback
as low as8.7 yrs
8.7–11.8 yrs at 2.7%/yr

Best-case figures with the range shown; Florida's tax exemptions included. Production reference: Homestead. Your roof, usage and heating change every number, which is what the estimate is for.

Full schedule and net-metering rules
Fixed charge
$30 per month
Energy
2.77¢ up to 1,000 kWh; 6.07¢ above that; plus 9.00¢ per kWh in riders
Net metering
Exported kWh earn Energy, Power Cost and Equity credits at the same per-kWh charges ('exactly the cost of each per-kilowatt-hour charge'); annual true-up each January; if generation exceeded consumption 'FKEC shall require the Member to limit system export' (no payout). Sizing capped at yearly net-zero; tiers 10 kW/100 kW/1 MW; AC rating = DC x 0.85.
Notes
The 'Power Cost' line (FPL wholesale cost passed through with no markup, varies monthly, never published) is the largest bill component; the 9-cent rider is an estimate, so a bill upload should override this entry.
Effective
April 1, 2026; checked November 1, 2026

Questions members ask

Does Florida Keys Electric Cooperative (FKEC) pay for excess solar power?
Excess power is banked as kWh at the full retail rate and drawn down in later months. The bank resets in January, and anything left is forfeited to the utility.
How big a solar system can I net-meter with Florida Keys Electric Cooperative (FKEC)?
Systems up to 1000 kW AC qualify for net metering.
Does Florida Keys Electric Cooperative (FKEC) have a demand charge?
Florida Keys Electric Cooperative (FKEC) has no residential demand charge, so every kWh solar offsets saves the full energy rate.
What would solar cost and save for a typical Florida Keys Electric Cooperative (FKEC) home?
For a electrically heated home using about 1100 kWh a month, a net-zero system is about 8.3 kW, costs roughly $18,346 to $22,423 installed, saves $1,684 to $1,930 in the first year, and pays back in 8.7 to 11.8 years at 2.7% a year rate growth. Your address gives a real figure in about a minute.
What federal incentives apply in 2026?
Florida exempts solar equipment from sales tax and keeps the value it adds off your property-tax bill, and both are already in these figures. Business-owned systems, including rental property, qualify for the 30% federal investment credit (Section 48E) and bonus depreciation when placed in service by the end of 2027; tax-exempt owners receive the 30% as cash. Not tax advice.
Where do these numbers come from?
The rate figures are read from Florida Keys Electric Cooperative (FKEC)'s own published schedule and net-metering policy (linked under Sources), last checked November 1, 2026. The worked example runs the same engine as the estimator, using a production reference for Homestead and Florida installed-cost data. If you spot an error, email us and we will correct it.

Service area

Tampa Electric (TECO)Florida Power & LightDuke Energy FloridaFlorida Public Utilities (FPUC)Kissimmee Utility Authority (KUA)Lake Worth Beach Electric UtilityLakeland ElectricLee County Electric Cooperative (LCEC)City Of LeesburgBaldwin County El Member CorpCity Of Moore HavenCity Of BartowCity Of Mount DoraNew Smyrna Beach Utilities CommissionCity Of NewberryOcala Electric UtilityPeace River Electric Cooperative (PRECO)Orlando Utilities Commission (OUC)City Of QuincyReedy Creek Improvement DistSouthern Pine Electric CooperativeCity Of StarkeSECO Energy (Sumter Electric Cooperative)Suwannee Valley Electric Cooperative (SVEC)City of Tallahassee UtilitiesTalquin Electric CooperativeThree Notch Electric Member CorpCity Of BlountstownTri-County Electric Cooperative (Madison)Alabama PowerCity Of AlachuaCity Of WauchulaWest Florida Electric CooperativeCity Of WillistonWiregrass Electric CooperativeWithlacoochee River Electric Cooperative (WREC)City Of BushnellOkefenoke REMCCentral Florida Electric Cooperative (CFEC)City Of ChattahoocheeChoctawhatchee Electric Cooperative (CHELCO)Clay Electric CooperativeCity Of ClewistonColquitt Electric Membership CorpCovington Electric CooperativeCity of Winter Park Electric UtilityEscambia River Electric Cooperative (EREC)City Of Fort MeadeFort Pierce Utilities AuthorityGainesville Regional Utilities (GRU)Georgia PowerGlades Electric CooperativeGrady Electric Membership CorpCity Of Green Cove SpringsGulf Coast Electric CooperativeHavana Power & Light CompanyCity Of HomesteadBeaches Energy Services (Jacksonville Beach)JEA (Jacksonville)Florida Keys Electric Cooperative (FKEC)
Florida Keys Electric Cooperative (FKEC)'s service territory (highlighted). Hover a region to see its utility.

Other Florida co-ops: Withlacoochee River Electric Cooperative (WREC), Clay Electric Cooperative, SECO Energy (Sumter Electric Cooperative), Peace River Electric Cooperative (PRECO), Lee County Electric Cooperative (LCEC), Suwannee Valley Electric Cooperative (SVEC). All 34 utilities.

Sources

Every figure on this page comes from the documents below. We print the schedule’s effective date and the date we last read it; when a utility publishes nothing, we say so instead of guessing quietly.

  1. Residential rate schedule: fixed charge, energy rate
    Effective April 1, 2026 · Checked November 1, 2026 · Not verified: placeholder figures
  2. Net-metering / distributed-generation policy
    Checked November 1, 2026 · Read from the primary source
  3. Service territory on the map
    Checked November 1, 2026 · Read from the primary source
  4. Worked example: production, installed cost, savings and payback
    Checked November 1, 2026 · Read from the primary source
  • Florida Keys Electric Cooperative (FKEC) does not publish a rate schedule online. The figures here are estimates pending the schedule; call the utility or upload a bill for your real price.

Spot an error or a rate change? Email mtsolarestimate@gmail.com. How the estimate itself is built: methodology.