Florida Power & Light members pay 14.3¢ per kWh and no demand charge; a typical home's solar pays back in about 11 years.

See the numbers for your address

At a glance

Energy rate
14.3¢/kWh
tiered by monthly use
Fixed charge
$11/mo
$30 minimum bill
Demand charge
None
every offset kWh saves the full rate
Net-metering limit
2000 kW AC
bank resets in December

Residential schedule effective October 1, 2026; checked November 1, 2026. Sources.

What this means for solar

  • Excess power is banked as kWh at the full retail rate and drawn down in later months. The bank resets in December, and anything left is paid out at about 3.00¢ per kWh.
  • Florida Power & Light has no residential demand charge, so every kWh solar offsets saves the full energy rate.
  • Systems up to 2000 kW AC qualify for net metering; above that, capacity would run without export credit.

A typical home: 1100 kWh a month, electric heat

Net-zero system
8.9 kW
1480 kWh per kW per year
Installed cost
as low as$19,288
up to $23,574
First-year savings
up to$1,880
at least $1,643
Payback
as low as9.4 yrs
9.4–12.6 yrs at 2.7%/yr

Best-case figures with the range shown; Florida's tax exemptions included. Production reference: Sebring. Your roof, usage and heating change every number, which is what the estimate is for.

Full schedule and net-metering rules
Fixed charge
$11 per month; minimum bill $30
Energy
12.26¢ up to 1,000 kWh; 14.26¢ above that
Net metering
kWh excess 'applied to the customer's next month's electric bill' and banked; remaining kWh credited on the December bill 'based on our average annual cost of electricity generation' (COG-1; the 3c figure is an estimate, FPL's 2025 true-up averaged about that). Tiers: 1 = 0-10 kW, 2 = >10-100 kW, 3 = >100 kW-2 MW (AC gross = DC x 0.85). Tier 2 $1M / Tier 3 $2M liability insurance; Tier 2 application fee $400. Bidirectional meter at no cost. $30 minimum base bill still applies.
Notes
2026-2029 settlement (PSC approved Nov 2025) sets stepped base rates; a Jan 2027 step-up and new fuel/clause factors take effect Jan 2027. The $30 minimum base bill applies to net-metering customers. Peninsular rates; the former Gulf Power area is fpl_nw.
Effective
October 1, 2026; checked November 1, 2026

Questions members ask

Does Florida Power & Light pay for excess solar power?
Excess power is banked as kWh at the full retail rate and drawn down in later months. The bank resets in December, and anything left is paid out at about 3.00¢ per kWh.
How big a solar system can I net-meter with Florida Power & Light?
Systems up to 2000 kW AC qualify for net metering.
Does Florida Power & Light have a demand charge?
Florida Power & Light has no residential demand charge, so every kWh solar offsets saves the full energy rate.
What would solar cost and save for a typical Florida Power & Light home?
For a electrically heated home using about 1100 kWh a month, a net-zero system is about 8.9 kW, costs roughly $19,288 to $23,574 installed, saves $1,643 to $1,880 in the first year, and pays back in 9.4 to 12.6 years at 2.7% a year rate growth. Your address gives a real figure in about a minute.
What federal incentives apply in 2026?
Florida exempts solar equipment from sales tax and keeps the value it adds off your property-tax bill, and both are already in these figures. Business-owned systems, including rental property, qualify for the 30% federal investment credit (Section 48E) and bonus depreciation when placed in service by the end of 2027; tax-exempt owners receive the 30% as cash. Not tax advice.
Where do these numbers come from?
The rate figures are read from Florida Power & Light's own published schedule and net-metering policy (linked under Sources), last checked November 1, 2026. The worked example runs the same engine as the estimator, using a production reference for Sebring and Florida installed-cost data. If you spot an error, email us and we will correct it.

Service area

Tampa Electric (TECO)Duke Energy FloridaFlorida Public Utilities (FPUC)Kissimmee Utility Authority (KUA)Lake Worth Beach Electric UtilityLakeland ElectricLee County Electric Cooperative (LCEC)City Of LeesburgBaldwin County El Member CorpCity Of Moore HavenCity Of BartowCity Of Mount DoraNew Smyrna Beach Utilities CommissionCity Of NewberryOcala Electric UtilityPeace River Electric Cooperative (PRECO)Orlando Utilities Commission (OUC)City Of QuincyReedy Creek Improvement DistSouthern Pine Electric CooperativeCity Of StarkeSECO Energy (Sumter Electric Cooperative)Suwannee Valley Electric Cooperative (SVEC)City of Tallahassee UtilitiesTalquin Electric CooperativeThree Notch Electric Member CorpCity Of BlountstownTri-County Electric Cooperative (Madison)Alabama PowerCity Of AlachuaCity Of WauchulaWest Florida Electric CooperativeCity Of WillistonWiregrass Electric CooperativeWithlacoochee River Electric Cooperative (WREC)City Of BushnellOkefenoke REMCCentral Florida Electric Cooperative (CFEC)City Of ChattahoocheeChoctawhatchee Electric Cooperative (CHELCO)Clay Electric CooperativeCity Of ClewistonColquitt Electric Membership CorpCovington Electric CooperativeCity of Winter Park Electric UtilityEscambia River Electric Cooperative (EREC)Florida Keys Electric Cooperative (FKEC)City Of Fort MeadeFort Pierce Utilities AuthorityGainesville Regional Utilities (GRU)Georgia PowerGlades Electric CooperativeGrady Electric Membership CorpCity Of Green Cove SpringsGulf Coast Electric CooperativeHavana Power & Light CompanyCity Of HomesteadBeaches Energy Services (Jacksonville Beach)JEA (Jacksonville)Florida Power & Light
Florida Power & Light's service territory (highlighted). Hover a region to see its utility.

Other Florida utilities: FPL Northwest Florida (former Gulf Power), Duke Energy Florida, Tampa Electric (TECO), Florida Public Utilities (FPUC). All 34 utilities.

Sources

Every figure on this page comes from the documents below. We print the schedule’s effective date and the date we last read it; when a utility publishes nothing, we say so instead of guessing quietly.

  1. Residential rate schedule: fixed charge, energy rate
    Effective October 1, 2026 · Checked November 1, 2026 · Read from the primary source
  2. Net-metering / distributed-generation policy
    Checked November 1, 2026 · Read from the primary source
  3. Service territory on the map
    Checked November 1, 2026 · Read from the primary source
  4. Worked example: production, installed cost, savings and payback
    Checked November 1, 2026 · Read from the primary source

Spot an error or a rate change? Email mtsolarestimate@gmail.com. How the estimate itself is built: methodology.

Your address, your numbers

Roof, usage and heating change everything above. The estimate takes about a minute and asks for no contact details.