Florida Solar Estimate

Electric cooperative

Solar with West Florida Electric Cooperative

West Florida Electric Cooperative members pay 11.6¢ per kWh and no demand charge; a typical home's solar pays back in about 23 years.

See the numbers for your address

At a glance

Energy rate
11.6¢/kWh
flat rate
Fixed charge
$35/mo
$35 minimum bill
Demand charge
None
every offset kWh saves the full rate
Net-metering limit
25 kW AC
exports paid at wholesale

Residential schedule effective May 1, 2022; checked November 1, 2026. Sources.

What this means for solar

  • Power you use on site saves the full retail rate; power you export is credited at about 5.20¢ per kWh, well below retail, and credits offset energy charges only with any balance deleted each December.
  • West Florida Electric Cooperative has no residential demand charge, so every kWh solar offsets saves the full energy rate.
  • Systems up to 25 kW AC qualify for net metering; above that, capacity would run without export credit.
  • There is a $135 interconnection fee.

A typical home: 1100 kWh a month, electric heat

Net-zero system
9 kW
1464 kWh per kW per year
Installed cost
as low as$19,440
up to $23,760
First-year savings
up to$764
at least $668
Payback
as low as20.4 yrs
20.4–26.6 yrs at 2.7%/yr

Best-case figures with the range shown; Florida's tax exemptions included. Production reference: Marianna. Your roof, usage and heating change every number, which is what the estimate is for.

Full schedule and net-metering rules
Fixed charge
$35 per month; minimum bill $35
Energy
11.64¢ all kWh
Net metering
Member-Owned Generation (<=25 kW): billed on RS; exports credited at $0.052/kWh (tariff RS-NM 'Rate as of August 1, 2021', based on average avoided cost; still 5.2 cents on 2025 handout). MOG agreement: credits carry forward within the 12-month period and any outstanding credit is paid at period end; tariff says unused credit reverts on exit. Solar members 'are charged $4.94 per kW of their overall system capacity' (PowerSouth fixed-cost pass-through, read as per kW per month like EREC's).
Notes
Excludes the Power Cost Adjustment, which WFEC does not post. WFEC's 2025 solar handout rounds the buy rate to 12 cents (<=1,000 kWh) and 13 cents above, suggesting PCA is embedded there. Three-phase $55.
Effective
May 1, 2022; checked November 1, 2026

Questions members ask

Does West Florida Electric Cooperative pay for excess solar power?
Power you use on site saves the full retail rate; power you export is credited at about 5.20¢ per kWh, well below retail, and credits offset energy charges only with any balance deleted each December.
How big a solar system can I net-meter with West Florida Electric Cooperative?
Systems up to 25 kW AC qualify for net metering. The interconnection fee is $135.
Does West Florida Electric Cooperative have a demand charge?
West Florida Electric Cooperative has no residential demand charge, so every kWh solar offsets saves the full energy rate.
What would solar cost and save for a typical West Florida Electric Cooperative home?
For a electrically heated home using about 1100 kWh a month, a net-zero system is about 9 kW, costs roughly $19,440 to $23,760 installed, saves $668 to $764 in the first year, and pays back in 20.4 to 26.6 years at 2.7% a year rate growth. Your address gives a real figure in about a minute.
What federal incentives apply in 2026?
Florida exempts solar equipment from sales tax and keeps the value it adds off your property-tax bill, and both are already in these figures. Business-owned systems, including rental property, qualify for the 30% federal investment credit (Section 48E) and bonus depreciation when placed in service by the end of 2027; tax-exempt owners receive the 30% as cash. Not tax advice.
Where do these numbers come from?
The rate figures are read from West Florida Electric Cooperative's own published schedule and net-metering policy (linked under Sources), last checked November 1, 2026. The worked example runs the same engine as the estimator, using a production reference for Marianna and Florida installed-cost data. If you spot an error, email us and we will correct it.

Service area

Tampa Electric (TECO)Florida Power & LightDuke Energy FloridaFlorida Public Utilities (FPUC)Kissimmee Utility Authority (KUA)Lake Worth Beach Electric UtilityLakeland ElectricLee County Electric Cooperative (LCEC)City Of LeesburgBaldwin County El Member CorpCity Of Moore HavenCity Of BartowCity Of Mount DoraNew Smyrna Beach Utilities CommissionCity Of NewberryOcala Electric UtilityPeace River Electric Cooperative (PRECO)Orlando Utilities Commission (OUC)City Of QuincyReedy Creek Improvement DistSouthern Pine Electric CooperativeCity Of StarkeSECO Energy (Sumter Electric Cooperative)Suwannee Valley Electric Cooperative (SVEC)City of Tallahassee UtilitiesTalquin Electric CooperativeThree Notch Electric Member CorpCity Of BlountstownTri-County Electric Cooperative (Madison)Alabama PowerCity Of AlachuaCity Of WauchulaCity Of WillistonWiregrass Electric CooperativeWithlacoochee River Electric Cooperative (WREC)City Of BushnellOkefenoke REMCCentral Florida Electric Cooperative (CFEC)City Of ChattahoocheeChoctawhatchee Electric Cooperative (CHELCO)Clay Electric CooperativeCity Of ClewistonColquitt Electric Membership CorpCovington Electric CooperativeCity of Winter Park Electric UtilityEscambia River Electric Cooperative (EREC)Florida Keys Electric Cooperative (FKEC)City Of Fort MeadeFort Pierce Utilities AuthorityGainesville Regional Utilities (GRU)Georgia PowerGlades Electric CooperativeGrady Electric Membership CorpCity Of Green Cove SpringsGulf Coast Electric CooperativeHavana Power & Light CompanyCity Of HomesteadBeaches Energy Services (Jacksonville Beach)JEA (Jacksonville)West Florida Electric Cooperative
West Florida Electric Cooperative's service territory (highlighted). Hover a region to see its utility.

Solar by city in West Florida Electric Cooperative's area: · also part of the Marianna area. All Florida cities.

Other Florida co-ops: Withlacoochee River Electric Cooperative (WREC), Clay Electric Cooperative, SECO Energy (Sumter Electric Cooperative), Peace River Electric Cooperative (PRECO), Lee County Electric Cooperative (LCEC), Suwannee Valley Electric Cooperative (SVEC). All 34 utilities.

Sources

Every figure on this page comes from the documents below. We print the schedule’s effective date and the date we last read it; when a utility publishes nothing, we say so instead of guessing quietly.

  1. Residential rate schedule: fixed charge, energy rate
    Effective May 1, 2022 · Checked November 1, 2026 · Read from the primary source
  2. Net-metering / distributed-generation policy
    Checked November 1, 2026 · Read from the primary source
  3. Service territory on the map
    Checked November 1, 2026 · Read from the primary source
  4. Worked example: production, installed cost, savings and payback
    Checked November 1, 2026 · Read from the primary source

Spot an error or a rate change? Email mtsolarestimate@gmail.com. How the estimate itself is built: methodology.

Your address, your numbers